How Brew Increased Engineering Capacity at Stratocyte With Brew embedded into Stratocyte’s engineering workflow, more of the team’s time reached development, the same engineering capacity could support more development work, and the cost per unit of development fell. The results 15% more engineering time dedicated to development 16% more monthly development capacity 10% lower cost...
